Welcome to Harishmane Infratech

Request a call
SI. No Particulars No. of Options/ Plan No. of Revisions Revision/fresh design charges
1 2D Floor Plan (All Floors) 3 2 10,000/Plan
2 Centerline Drawing 1 - 3,000/Change
3 Plinth Beam & UG Sump 1 - 3,000/Change
4 3D Elevation 3 2 15,000/Change
5 2D Elevation Working Drawing 1 - 3,000/Change
6 2D working Drawing (All Floors) 1 - 3,000/Change
7 "Structural Drawings (All Floors):
-Slab & Beam Layout.
-Structural Analysis report"
1 - 3,000/Change
8 Sunshade/ Chajja Drawing 1 - 3,000/Change
9 Roof Electrical Layout (All Floors) 1 - 3,000/Change
10 Wall Electrical Layout (All Floors) 1 1 3,000/Change
11 Electrical Looping Drawing (All Floor) 1 - 3,000/Change
12 Plumbing Layout (All Floors) 1 - 3,000/Change
13 Sanitary Ware Selection - - -
14 Fabrication Presentation 1 1 5,000/Change
15 Fabrication Drawing 1 - 5,000/Change
16 Flooring Layout 1 - 5,000/Change
17 Flooring Material Selection - - -
18 Door Presentation 1 - 3,000/Change
19 Doors 2D Drawing 1 - 3,000/Change
20 2D UPVC drawing 1 - 3,000/Change
21 Interior Design Presentation 1 - 3,000/Presentation
22 Interior Laminate & Color Selection 1 -
23 3D Interior Views 1 2 5,000/Render
24 2D Interior Drawing 1 - 3,000/Change
25 False Ceiling Presentation 1 - 3,000/Change
26 2D False ceiling Drawing 1 - 3,000/Change
27 Interior/ Exterior Paint Codes 1 - 3,000/Change
28 Designer Lights Selections 1 - 3,000/Change
29 Curtains Selection 1 - -
30 Furniture Selection 1 - -
3,00,000/- (GST @18% shall be Applicable)